Accessibility audit of Montreal Metro stations connected to the underground pedestrian network
The purpose of the physical audit was to assess the functional accessibility of the train and its infrastructure for selected users with disabilities. The audit has been designed to take account the user’s journey from the ground level to using the Metro. The accessibility audit of Montréal’s Metro stations connected to the underground city was conducted on 21-28 February 2010.

Map of six Metro stations linked to the underground pedestrian network and selected
access points (Map sourced from Hagg & El-Geneidy, 2010)

Results of accessibility audit on interior access of Metro stations